At this stage the project brief should be finalised, a preferred option agreed and the detailed design should be delivered within the identified parameters of cost, time and quality. Clear definition of the project is necessary in order to attain a successful outcome.
Previous Actions
Preconstruction encompasses the development of the detailed design, formulation of the tender documentation, undertaking the tender process and concluding the contract documentation. The choice of procurement route will determine how much of these stages overlap but by the start of this stage, a number of issues will have been addressed and actions taken, including the following:
Feasibility completed
LSC support for preferred option attained
Alternative site secured, disposals agreed
Surveys and statutory requirements concluded
Statutory authorities, utilities information concluded including consultation with the planning offices
Development cost plan prepared
Project team appointed. This should include main contractor representation as soon as is practical.
Project execution plan and programme established
Statutory Obligations
It is the duty of the design team to effect compliance with a statutory control and attain the appropriate consents e.g. consents for planning, Building Regulations, means of escape. Planning approvals can be a complex process and may require the appointment of specialist consultant to assist in attaining a successful approval.
Value Engineering
This is a process of examining the function of a building to ensure that it is delivered in the most cost effective way. It involves reviewing the design proposals at each stage of the design process to analyse whether client objectives have been achieved without over design or specification and at minimum cost. In major and complex projects this process may be best facilitated by a specialist in this field. In less complex projects this can be lead by the project manager.